Level 2 home charging installed in West Bountiful on a permitted, correctly sized 240-volt circuit — with the load calculation that tells you honestly whether your panel can take it.
A home charger is a simple job when the panel has room and a real project when it does not, and the only way to know which one you have is a load calculation. West Bountiful is smaller and quieter than its neighbor, with a lot of 1960s-80s homes on generous lots and the detached shops that come with them.
West Bountiful is smaller and quieter than its neighbor, with a lot of 1960s-80s homes on generous lots and the detached shops that come with them. That history shows up in the work.
Utah winters are the reason to size this correctly rather than minimally. Cold reduces battery efficiency, which means longer sessions at full current, and a circuit sized to the bare minimum is the one that gets warm every January.
Utility service here can come from the city or from Rocky Mountain Power depending on the address, so we confirm which one before we schedule a disconnect. We install home charging across West Bountiful and Davis County, including the Legacy Parkway corridor, and the load calculation comes before the quote every time.
240-volt circuits for Tesla Wall Connectors and universal J1772 and NACS units, sized to the charger and the run.
We calculate the existing load against your service before quoting, so nobody discovers the problem after the drywall is open.
When the service genuinely cannot carry the charger, we quote the upgrade and the charger together rather than in two surprises.
Some homes are better served by a load-management device than a full service upgrade. We will tell you when that is the cheaper honest answer.
Voltage drop on a long run is the thing most often done wrong. We size the conductor for the distance, not just the amperage.
Two chargers on one service takes planning, and sometimes load sharing, to do without oversizing everything.
Permits: we pull the West Bountiful electrical permit where the work requires one and schedule the inspection.
Power company: confirmed per address — Rocky Mountain Power or the city power department. We verify it before scheduling the disconnect.
Local conditions: Utility service here can come from the city or from Rocky Mountain Power depending on the address, so we confirm which one before we schedule a disconnect.
You never deal with the city or the utility. That is our job.
We work throughout West Bountiful and Davis County, including the Legacy Parkway corridor.
Often yes on a 200-amp service, and often not on a 100-amp service already running central air and electric appliances. The load calculation gives a definite answer, and we do it before quoting rather than after.
Yes — a new 240-volt circuit is permitted work. We pull the West Bountiful electrical permit and schedule the inspection as part of the installation.
Tesla Wall Connectors and universal J1772 and NACS units from the major manufacturers. If you already bought a charger we will install it; if you have not, we will tell you what actually matters in the choice.
Utah winters reduce battery efficiency, which means longer charging sessions and more hours at full current. That is an argument for sizing the circuit correctly rather than to the minimum.
Yes. The run length drives the conductor size and the cost, and it is where corner-cutting shows up as a charger that throttles or trips. We size it properly.
Run the numbers yourself with our free EV charger, panel-upgrade, energy and generator calculators. No email required.
Licensed, insured and ready now. Free estimates, upfront pricing, five-year warranty.